|
|
finished
roombox |
|
|
|
1 - The beginning
2 - I now saw the left wall window, but the partitions are
not assembled yet. There are 5 mm foamboard stuck on the left wall
and on the left of the bottom wall to make the false window.
|
|
|
|
|
|
|
|
|
Left wall, any more to do but the stained glass. |
|
|
|
|
|
|
|
|
3 - The box is now assembled, so i can make finally the elevated
corner cooks (in pine with balsa floor) and its racks. |
|
4 - Then joining of the ground in floor tiles, the beams
and the tiling of kitchen. |
|
|
|
|
|
|
|
|
|
|
|
|
With a seen of all the accessories... |
|
|
|
|
|
and set up almost definitively after the manufacture of the staircase. |
|
|
the end |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|